Rockland, ME.
Stitched together in Hugin from 33 camera phone pictures. Miller cylindrical projection.

Tech artist. Dad. Horror snob. Blogging since 1999.
Rockland, ME.
Stitched together in Hugin from 33 camera phone pictures. Miller cylindrical projection.
Decided to sawtooth the rafters and use overlaid planks for roofing.

Recut the tops of the rafters with a jigsaw.

Put in a temporary floor to work on. Left a gap for the door frame. Had to cover the gap when the chipmunks started getting under the floor.

Tried to pound the ridge into place with a rubber mallet. Found that I’d placed one of the rafters wrong, and had to unscrew and move it. Height of the westernmost rafter about half an inch too short. Not going to worry about it.

Hard to tell from the picture, but the first snow of the season came, and I don’t have the roof on. Will need to hurry it up.

Scrounged some old planks for the roof. Condition was poorer than I expected. Cut boards to size. Filled gouges, nail holes and cracks with wood filler.

Duct-taped vinyl gloves to my sleeves and painted roof planks with Coppercoat wood preservative. Smell didn’t dissipate for weeks.

Hammered all but the topmost planks into place on a stepladder. Height difference of the westernmost rafter causing problems. Should be able to solve it later with trim.

Cross-braced the rafters to make sure the roof would support my weight. Strapped an extension ladder to the frame of the shack to get access to the roof — wanted the frame to be holding my weight, not the ground at the base of the ladder.

Nailed final sections of roofing in.

Offered to haul off some aluminum rain gutters my friends had been meaning to take to the dump. Hacksawed and hammered a roof peak out of one. Pounded nail holes in the workshop. Covered nail holes on the underside with Gorilla Tape as an additional water stop. Nailed roof peak into place.

You go up to Appleton; you get your hair cut. You see a “No on 1” sign down on the verge. You park, you put it back up next to the “Yes on 1” sign. The grass was just mowed. You figure maybe they both got knocked over by the mower and the Yes people are just more vigilant about getting their signs back up.
You drive back to 131. You see another “No on 1” sign down at the intersection. You park, you fix it. You figure, hey, we had some rain and wind, maybe they both went down and the Yes people are just more vigilant about getting their signs back up.
You learn better as you pass the sign at the intersection of route 17, which has been spray painted. Not just marked, either: Someone had a stencil. Looks like they bugged out halfway through though; it’s just a big yellow overspray mess unless you look closely.
On the common — in your hometown — you find a “No on 1” sign down. The stakes have been pulled out of the ground. One’s been stolen. You come back with a hammer. You put the sign back up next to the “Yes on 1” sign. You’d be happy to do this for the Yes signs as well, but none of them have been vandalized.
You go down to the town office, and register to vote. This is your town too.
What’s to prevent individual teachers from discussing homosexual issues now?
I get it. You don’t like gay people. You don’t know any gay people. It’s not that big a deal, in real life.
The fact remains that if I like a girl I have the right to marry her, without any “seperate but equal” rejiggering. How could I, as a decent person, deny that right to someone else?
(Question 1 is a Maine ballot initiative to outlaw gay marriage.)
Walls went up today.

Clamped a strip of wood to a floor joist. Lifted the west wall into place, levelled it, and clamped it to the strip. Screwed the wall into the floor frame.

Lifted the north wall into place. Secured it to the west wall and floor. Removed strip and clamps from the west wall.

Repeat for the south wall.

Managed not to fall down the banking hauling the east wall into place. Attached it to the other walls and floor.

Roof next, if I can find the materials.
Scrounged some bricks and began trying to level the ground. Laid stakes at a desired level.

Big rock on the spot I selected. Started digging it out. Planned to get under it and tip it flat, then fill around it again.

Rock turned out to be bigger than expected. Afternoon was disappearing.

Found the “bottom” about 3 feet down.

Tried to tilt it with a plank. Wouldn’t budge. Kept digging out around it and retrying. Realized I’d only uncovered the narrow end of a long, flat boulder. Gave up and filled the hole back in.

Decided to bring the floor frame itself in and see how low it could sit on top of the boulder’s edge.

Repacked the dirt as much as possible.

Worked out the lowest point the floor could sit. Levelled the floor frame using the ledge as a fulcrum.

Set four sets of four bricks crossways to act as feet for a plank on the banking (east) side.

Levelled and packed the dirt, and laid a line of bricks under the west side.

Drove additional stakes to keep the east plank and bricks in place. Cut a second plank to fit north and south sides. Dug and set them in place.

Secured the floor to the planks with 3″ screws, toenailed in alternating directions. Partially filled the inside with dirt.
More at YouTubeCapper.Blogspot.com. Create your own here.
You need Flash player 8+ and JavaScript enabled to view this video.
However, due to time constraints…
Capped by Space Toast
YouTubeCapper.Blogspot.com
The day’s favorite American euphemism for deliberate class stratification, “good schools,” is back, this time from Nicholas Kristof in the New York Times. This one is doubly insidious because liberals are still comfortable saying it aloud. I bitchslapped Kristof’s fellow white-flight New Yorker Malcolm Gladwell when he took this same call up a year ago, and since nothing’s changed, I’ll refer you to my post from that time, Malcolm Gladwell’s Good Teacher/Bad Teacher Delusion.
Snip:
Don’t blame students; don’t blame parents; don’t blame underfunded schools; don’t blame distending class sizes, don’t blame school funding being tied to local property taxes; don’t blame artificial testing requirements devouring classroom time; don’t blame required special education skewing dollar-per-student vs. results numbers wildly below magnet and parochial schools; don’t blame the flight of your upper-middle class into homogenous neighborhoods.
Framed the rafters and cut a ridge beam.

Still figuring out roofs. Went through a lot of revisions.

Used rise over run rather than angles as much as possible. Some bad math early on.

Pine a pleasure to cut on the tablesaw after all that rock-hard oak.

Rounded rafter ends a motif from early on in designs. Mirrored it with the ridge beam.

Might drill a hole and hang a lamp/planter/bird feeder off east and west ends of the beam.

Need to level the ground and lay a brick slab next. This is moving outside the workshop. Quixotic.